News Flash

Okmulgee News Flash

Posted on: April 9, 2020

Downtown Construction

construction worker

Construction of a 12" water line and street improvements will begin the week of April 13th, 2020.  Work will take place along 6th St. from Alabama Ave to Deleware Ave.

The proposed water line construction will take place on the north side of the street and will require new tie-ins, service lines, and hydrants.  The Council House Block and Intersections will require partial street removal and concrete work.  Finally, an asphalt overlay will be constructed along the entire length of the project prior to all new road and parking striping.  

This work will require temporary lane closures and possible street closures.  Street closures will take place in a maximum of two block increments if necessary.  A proposed detour will be prepared along 8th St. during the street closures.

Facebook Twitter Email

Other News in Okmulgee News Flash

Okmulgee Library

City Buildings During COVID-19

Posted on: March 16, 2020